The_Recorder_Albion_Michigan
  • The Recorder
    • Facebook
    • Contact
    • History
    • Salesman Publications
    • Morning Star
  • Writers
    • Writer – Michelle Mueller
    • Writer – Frank Passic
    • Writer – Linda Kolmodin
    • Albion Through My Eyes
    • Benavidez
  • News
    • Stories
    • Subscribe
    • Front Pages 2020
    • Front Pages 2019
  • Albion
    • AlbionMich.net
    • Albion Index
    • Calendar
    • Churches
    • General Guide
  • Search
  • The Recorder
    • Facebook
    • Contact
    • History
    • Salesman Publications
    • Morning Star
  • Writers
    • Writer – Michelle Mueller
    • Writer – Frank Passic
    • Writer – Linda Kolmodin
    • Albion Through My Eyes
    • Benavidez
  • News
    • Stories
    • Subscribe
    • Front Pages 2020
    • Front Pages 2019
  • Albion
    • AlbionMich.net
    • Albion Index
    • Calendar
    • Churches
    • General Guide
  • Search

By Maggie LaNoue
Contributing Writer

September 12, 2025

Aerial view of Albion’s millpond and dam, where proposed removal would reconnect more than 40 miles of stream habitat.

Dam Removal Talk Highlights Long Road to River Renewal

Blueprints showing the future of the Kalamazoo River in Albion, both the north branch and the south branch, took center stage Tuesday night as a consultant outlined 43 pages of plans for dam removal and restoration. Engineer Suzannah Deneau of Wightman drove an hour and a half to present what is called a 60 percent design packet. That milestone represents more than a conceptual sketch but not yet a construction-ready plan. At this stage, engineers refine cost estimates, test the feasibility of embankment treatments, and confirm how sediment and floodplain benches will be managed. It also allows regulators and the public to review the design before final details are locked in. “The purpose of this project is to restore fish passage and reconnect over 40 miles of habitat,” Deneau said. “It’s about improving safety, improving ecology, and giving Albion a healthier river for generations to come.”
Engineer Suzannah Deneau of Wightman presents the 60 percent design packet to Albion City Council, outlining details of the long-term dam removal project.


The Michigan Department of Environment, Great Lakes, and Energy (EGLE) requires the city to move forward because the dam is considered in need of repair, and rebuilding it is not financially feasible.
Approval of the design stage keeps Albion eligible for state and federal funding, though construction cannot begin until those dollars are secured.
Resident Rick Lange raised questions about the project’s impact on local homeowners. “Is there a way to hold assessed valuation steady until the project is behind us? And will there be good access to the river so people can come downtown and use the restaurants?” he asked.

Attendance for the presentation was light compared to August’s crowded Washington Gardner sessions, and some struggled to hear due to sound issues. Still, the message was clear: dam removal is a long-term process, with a timeline that could stretch seven years or more before Albion sees the full renewal of its riverfront.

One page of the blueprint package explained by Engineer Deneau at the council meeting

Other Stories of Rivers and Dams

Dam Removal Talk Highlights Long Road to River Renewal

Read More »

Albion Council Approves River Restoration Plan

Read More »

Albion Dam Removal Open House Draws Questions and Curiosity

Read More »
last stop log

A dam site better at the old Concord Mill Pond!

Read More »

Labor Day Albion 2021 – Walk the River Trail

Read More »

Three Towns, A River and its Mill Ponds

Read More »

More creative work for those who love Albion Michigan.  Click here or a picture to read the legends and to find out how to order.

Haven Hills Farm
The Great Blizzard
Mac Bridge
Park Place
The Forks
Downtown Albion New Hotel
The Molder
Saturday in Town

The Recorder Newspaper

Support local journalism

Subscribe today

Click here

TheRecorderNewspaper.com
Serving Albion and the surrounding communities since 1868

Writers

  • Benavidez
  • Mueller
  • Kolmodin
  • Nicolás
  • Passic

About

  • Contact
  • History
  • Ownership
  • Facebook
  • Search

News

  • 2020
  • 2019
  • Stories
  • Subscribe
  • Morning Star

Related

  • AlbionMich.net
  • General Guide
  • Churches
  • Calendar
  • City Index